Analysis Of Pavement Improvement Planning For the Lumajang City Boundary Road Section – BTS, Jember District
Keywords:
Road Repair, Road Damage, Overlay MethodAbstract
Road damage is a common issue that arises due to various factors, including substandard construction quality, overloaded vehicles, and extreme weather conditions. The road segment connecting Lumajang City Limits to Jember District Limits has been identified as experiencing deterioration at several locations, predominantly caused by vehicles carrying loads that exceed the maximum allowable capacity. This study focuses on evaluating the current condition of the road, estimating the required repair costs, and assessing the economic feasibility of implementing the repairs. The research methodology incorporates field surveys to gather primary data, such as the extent, severity, and distribution of road damage, along with secondary data on traffic volumes and vehicle loads. The analysis involves classifying road conditions and calculating repair costs using the overlay method, which considers structural improvements needed to restore optimal functionality. The results indicate that out of the total road length, 1.66 kilometers are classified as being in good condition, 1.3 kilometers are in fair condition, 7.2 kilometers have minor damage, and 4 kilometers are severely damaged. These findings provide essential insights for prioritizing repair works and formulating cost-effective strategies to improve road infrastructure in the region.
Downloads
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Rendy Zesario Akbar, Budi Witjaksana, Jaka Purnama

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International. that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work.
